Some checks failed
Blockchain Synchronization Verification / sync-verification (push) Failing after 8s
CLI Tests / test-cli (push) Successful in 10s
Contract Performance Benchmarks / benchmark-gas-usage (push) Successful in 1m22s
Contract Performance Benchmarks / benchmark-execution-time (push) Successful in 1m11s
Contract Performance Benchmarks / benchmark-throughput (push) Successful in 1m13s
Cross-Chain Functionality Tests / test-cross-chain-sync (push) Failing after 5s
Cross-Chain Functionality Tests / test-cross-chain-transactions (push) Successful in 5s
Cross-Chain Functionality Tests / test-cross-chain-bridge (push) Has been skipped
Cross-Chain Functionality Tests / test-multi-chain-consensus (push) Failing after 3s
Cross-Chain Functionality Tests / aggregate-results (push) Has been skipped
Cross-Node Transaction Testing / transaction-test (push) Successful in 5s
Deploy to Testnet / deploy-testnet (push) Successful in 1m14s
Contract Performance Benchmarks / compare-benchmarks (push) Has been cancelled
Documentation Validation / validate-docs (push) Failing after 10s
Multi-Node Stress Testing / stress-test (push) Has been cancelled
Node Failover Simulation / failover-test (push) Has been cancelled
Security Scanning / security-scan (push) Has been cancelled
Smart Contract Tests / test-solidity (map[name:aitbc-contracts path:contracts]) (push) Has been cancelled
Smart Contract Tests / test-solidity (map[name:aitbc-token path:packages/solidity/aitbc-token]) (push) Has been cancelled
Smart Contract Tests / test-foundry (push) Has been cancelled
Smart Contract Tests / lint-solidity (push) Has been cancelled
Smart Contract Tests / deploy-contracts (push) Has been cancelled
Documentation Validation / validate-policies-strict (push) Successful in 3s
Integration Tests / test-service-integration (push) Failing after 45s
Multi-Chain Island Architecture Tests / test-multi-chain-island (push) Failing after 2s
Multi-Node Blockchain Health Monitoring / health-check (push) Successful in 5s
P2P Network Verification / p2p-verification (push) Successful in 3s
Production Tests / Production Integration Tests (push) Failing after 7s
Python Tests / test-python (push) Failing after 46s
Staking Tests / test-staking-service (push) Failing after 2s
Staking Tests / test-staking-integration (push) Has been skipped
Staking Tests / test-staking-contract (push) Has been skipped
Staking Tests / run-staking-test-runner (push) Has been skipped
Systemd Sync / sync-systemd (push) Successful in 21s
API Endpoint Tests / test-api-endpoints (push) Failing after 12m19s
- Changed pytest calls to use `venv/bin/python -m pytest` with explicit config - Added `--rootdir "$PWD"` and `--import-mode=importlib` for consistent imports - Fixed PYTHONPATH to use absolute paths with $PWD prefix - Added smart contract security scanning for Solidity files - Added Circom circuit security checks for ZK proof circuits - Added ZK proof implementation security validation - Added contracts/** to security scanning workflow
13 KiB
13 KiB
AITBC Disaster Recovery Drill Plan
Version: 1.0 Date: 2026-05-11 Status: Active Next Review: 2026-08-11
Overview
This document outlines the disaster recovery drill schedule, procedures, and reporting for the AITBC platform. Regular drills ensure the disaster recovery plan is effective, team members are trained, and recovery procedures are validated.
Drill Schedule
2026 Drill Calendar
| Month | Drill Type | Duration | Target Date | Status |
|---|---|---|---|---|
| February | Tabletop Exercise | 2 hours | 2026-02-15 | Scheduled |
| March | Service Failover | 1 hour | 2026-03-15 | Scheduled |
| April | Database Restore | 1 hour | 2026-04-15 | Scheduled |
| May | Full System Recovery | 4 hours | 2026-05-15 | Scheduled |
| June | Tabletop Exercise | 2 hours | 2026-06-15 | Scheduled |
| July | Service Failover | 1 hour | 2026-07-15 | Scheduled |
| August | Database Restore | 1 hour | 2026-08-15 | Scheduled |
| September | Full System Recovery | 4 hours | 2026-09-15 | Scheduled |
| October | Tabletop Exercise | 2 hours | 2026-10-15 | Scheduled |
| November | Service Failover | 1 hour | 2026-11-15 | Scheduled |
| December | Data Center Failover | 8 hours | 2026-12-15 | Scheduled |
Drill Types
1. Tabletop Exercise
- Frequency: Quarterly
- Duration: 2 hours
- Participants: Engineering, DevOps, Security, Product
- Format: Discussion-based scenario walkthrough
- Objective: Validate decision-making processes and communication
2. Service Failover
- Frequency: Monthly
- Duration: 1 hour
- Participants: DevOps, Engineering
- Format: Actual service restart/failover
- Objective: Validate automated failover mechanisms
3. Database Restore
- Frequency: Monthly
- Duration: 1 hour
- Participants: DBA, DevOps
- Format: Actual database restore from backup
- Objective: Validate backup integrity and restore procedures
4. Full System Recovery
- Frequency: Quarterly
- Duration: 4 hours
- Participants: All teams
- Format: Complete system recovery simulation
- Objective: Validate end-to-end recovery procedures
5. Data Center Failover
- Frequency: Annually
- Duration: 8 hours
- Participants: All teams
- Format: Geographic failover simulation
- Objective: Validate multi-region recovery capabilities
Drill Procedures
Pre-Drill Preparation (2 Weeks Before)
-
Define Drill Scenario
- Select disaster scenario from DR plan
- Define specific objectives and success criteria
- Identify affected components and services
- Determine scope and limitations
-
Prepare Test Environment
- Set up isolated test environment (if needed)
- Prepare test data and backups
- Configure monitoring and logging
- Verify tooling and access
-
Notify Participants
- Send drill invitation with details
- Confirm participant availability
- Share drill scenario and objectives
- Provide pre-reading materials
-
Prepare Monitoring
- Set up additional monitoring for drill
- Configure alerting for drill events
- Prepare metrics collection
- Set up logging capture
-
Establish Success Criteria
- Define measurable objectives
- Set RTO/RPO targets for drill
- Define pass/fail criteria
- Document expected outcomes
During Drill Execution
1. Drill Kickoff (15 minutes)
- Call to order and attendance check
- Review drill scenario and objectives
- Review roles and responsibilities
- Review communication channels
- Start timer and begin drill
2. Drill Execution (Variable)
- Execute according to scenario
- Document all actions and timestamps
- Record issues and blockers
- Monitor system behavior
- Communicate progress per plan
3. Drill Completion (15 minutes)
- Stop timer and conclude drill
- Collect initial observations
- Verify system state
- Begin preliminary debrief
Post-Drill Activities
Immediate Post-Drill (1 Hour)
-
Collect Metrics
- RTO achieved
- RPO achieved
- Success criteria met
- Issues encountered
-
Initial Debrief
- Participant feedback
- Observations and findings
- Immediate issues identified
- Preliminary recommendations
Post-Drill Review (1 Week)
-
Analyze Results
- Compare results to objectives
- Identify gaps and weaknesses
- Analyze root causes of issues
- Document lessons learned
-
Update Documentation
- Update DR procedures
- Update runbooks
- Update monitoring/alerting
- Update contact information
-
Create Action Items
- Assign owners and due dates
- Prioritize improvements
- Track completion
- Schedule follow-up
Drill Scenarios
Scenario 1: Database Corruption
- Type: Database Restore
- Severity: P1
- Components: PostgreSQL
- Steps:
- Simulate database corruption
- Stop affected services
- Restore from latest backup
- Verify data integrity
- Restart services
- Verify system health
Success Criteria:
- Database restored within RTO (1 hour)
- Data integrity verified
- Services operational within 30 minutes post-restore
- Zero data loss
Scenario 2: Service Failure
- Type: Service Failover
- Severity: P2
- Components: Coordinator API, Marketplace, Exchange
- Steps:
- Simulate service crash
- Monitor automatic failover
- Verify pod restart
- Test service health
- Verify data consistency
Success Criteria:
- Automatic failover within 5 minutes
- Service health restored
- Zero data loss
- Error rate returns to normal
Scenario 3: Network Partition
- Type: Tabletop Exercise
- Severity: P2
- Components: All services
- Steps:
- Discuss network partition scenario
- Walk through response procedures
- Identify decision points
- Validate communication plan
- Document gaps
Success Criteria:
- Response procedures validated
- Communication plan confirmed
- Decision points identified
- Gaps documented
Scenario 4: Data Center Outage
- Type: Data Center Failover
- Severity: P1
- Components: All services
- Steps:
- Simulate data center failure
- Activate alternate data center
- Restore from backup (if needed)
- Update DNS
- Verify service availability
- Monitor system performance
Success Criteria:
- Alternate data center activated within 4 hours
- Services operational
- DNS propagation complete
- Performance acceptable
Scenario 5: Security Breach
- Type: Tabletop Exercise
- Severity: P1
- Components: All services
- Steps:
- Discuss breach scenario
- Walk through containment procedures
- Validate forensic preservation
- Review communication plan
- Document legal/compliance requirements
Success Criteria:
- Containment procedures validated
- Forensic procedures confirmed
- Communication plan tested
- Compliance requirements identified
Drill Reporting
Drill Report Template
# Disaster Recovery Drill Report
## Basic Information
- **Drill ID:** DRILL-YYYYMMDD-001
- **Date:** [Date]
- **Type:** [Drill Type]
- **Scenario:** [Description]
- **Duration:** [Actual Duration]
- **Participants:** [Names]
## Objectives
- [Objective 1]
- [Objective 2]
- [Objective 3]
## Success Criteria
| Criteria | Target | Actual | Status |
|----------|--------|--------|--------|
| [Criteria 1] | [Target] | [Actual] | [Met/Not Met] |
| [Criteria 2] | [Target] | [Actual] | [Met/Not Met] |
| [Criteria 3] | [Target] | [Actual] | [Met/Not Met] |
## Metrics
- **RTO Target:** [Target]
- **RTO Achieved:** [Actual]
- **RPO Target:** [Target]
- **RPO Achieved:** [Actual]
- **Backup Restore Time:** [Time]
- **Service Recovery Time:** [Time]
## Timeline
| Time | Action | Owner | Status |
|------|--------|-------|--------|
| [Time] | [Action] | [Owner] | [Status] |
| [Time] | [Action] | [Owner] | [Status] |
## Issues Encountered
### Issue 1
- **Description:** [Description]
- **Impact:** [Impact]
- **Resolution:** [Resolution]
- **Prevention:** [Prevention]
### Issue 2
- **Description:** [Description]
- **Impact:** [Impact]
- **Resolution:** [Resolution]
- **Prevention:** [Prevention]
## Lessons Learned
- [Lesson 1]
- [Lesson 2]
- [Lesson 3]
## Action Items
| Action | Owner | Due Date | Status |
|--------|-------|----------|--------|
| [Action 1] | [Owner] | [Date] | [Status] |
| [Action 2] | [Owner] | [Date] | [Status] |
| [Action 3] | [Owner] | [Date] | [Status] |
## Recommendations
- [Recommendation 1]
- [Recommendation 2]
- [Recommendation 3]
## Next Steps
- [Next Step 1]
- [Next Step 2]
## Sign-off
- **Drill Lead:** [Name] - [Date]
- **Observer:** [Name] - [Date]
Report Distribution
- Primary: CTO, Engineering Lead, DevOps Lead
- Secondary: All participants
- Archive: Confluence/wiki
- Retention: 3 years
Drill Metrics Tracking
Quarterly Metrics Report
| Metric | Q1 Target | Q1 Actual | Q2 Target | Q2 Actual | Q3 Target | Q3 Actual | Q4 Target | Q4 Actual |
|---|---|---|---|---|---|---|---|---|
| Drill Completion Rate | 100% | 100% | 100% | 100% | ||||
| Success Criteria Met | 90% | 90% | 90% | 90% | ||||
| RTO Achievement | 90% | 90% | 90% | 90% | ||||
| RPO Achievement | 95% | 95% | 95% | 95% | ||||
| Participant Satisfaction | 80% | 80% | 80% | 80% |
Action Item Tracking
| Action Item | Drill ID | Owner | Due Date | Status | Closed Date |
|---|---|---|---|---|---|
| [Action] | [ID] | [Owner] | [Date] | [Status] | [Date] |
Continuous Improvement
Drill Feedback Process
-
Immediate Feedback
- Collect participant feedback during drill
- Note issues in real-time
- Adjust drill if needed
-
Post-Drill Survey
- Send survey within 24 hours
- Ask about drill effectiveness
- Collect suggestions for improvement
- Rate drill difficulty and realism
-
Quarterly Review
- Review drill metrics
- Identify trends
- Adjust drill schedule
- Update drill scenarios
Drill Improvement Cycle
Plan → Execute → Review → Improve → Plan
- Plan: Design drill scenario and objectives
- Execute: Run drill according to procedures
- Review: Analyze results and collect feedback
- Improve: Update procedures and plan next drill
Roles and Responsibilities
Drill Coordinator
- Plan and schedule drills
- Coordinate participants
- Lead drill execution
- Document results
- Track action items
Drill Observer
- Observe drill execution
- Take detailed notes
- Provide unbiased feedback
- Identify improvement areas
Drill Participants
- Participate in drill execution
- Follow drill procedures
- Provide feedback
- Complete action items
Management
- Approve drill schedule
- Review drill results
- Allocate resources
- Support improvement initiatives
Training
New Hire Training
- Content: DR plan overview, drill procedures
- Frequency: Onboarding
- Duration: 1 hour
- Format: Presentation + walkthrough
Annual Refresher Training
- Content: Full DR plan, recent drill results
- Frequency: Annually
- Duration: 2 hours
- Format: Workshop
Role-Specific Training
- DBA: Database restore procedures
- DevOps: Service failover procedures
- Security: Incident response procedures
- Engineering: Service recovery procedures
Compliance
Regulatory Requirements
- SOC 2: Annual DR testing
- ISO 27001: Annual DR testing
- GDPR: Data breach response testing
- PCI DSS: Annual DR testing
Audit Trail
- Drill schedules
- Drill reports
- Action items
- Training records
- Metrics and trends
Appendix
A. Drill Checklist
Pre-Drill
- Scenario defined
- Objectives set
- Participants notified
- Environment prepared
- Monitoring configured
- Success criteria defined
During Drill
- Kickoff completed
- Timeline tracked
- Actions documented
- Issues recorded
- Communication maintained
- Metrics collected
Post-Drill
- Metrics analyzed
- Report completed
- Action items assigned
- Documentation updated
- Feedback collected
- Next drill scheduled
B. Contact Information for Drills
| Role | Name | Phone | |
|---|---|---|---|
| Drill Coordinator | |||
| DevOps Lead | |||
| DBA | |||
| Security Lead |
C. Quick Reference
Emergency Drill Termination
# If drill causes actual incident, terminate immediately
kubectl scale deployment --all --replicas=[original-counts]
# Notify drill coordinator
# Document termination reason
# Schedule follow-up review
Drill Status Check
# Check current drill status
# View drill metrics
# Monitor system health
Approval
| Role | Name | Date | Signature |
|---|---|---|---|
| CTO | |||
| Engineering Lead | |||
| DevOps Lead | |||
| Operations Manager |